PLC ENGINEERING

Honeywell Process Knowledge System C300

Home

Honeywell Process Knowledge System C300

  • Honeywell PKS system knowledge (1)
    Honeywell PKS system knowledge (1) Sep 05, 2023
    1. Fault-tolerant Ethernet is the control network of PKS. FTE not only provides fault-tolerant features, but also provides fast network response and security for industrial Ethernet control applications. FTE (Fault Tolerant Etherent) Fault-tolerant Ethernet is a single network with a redundant network structure, implemented through Honeywell's FTE driver and commercial network equipment. FTE networks include redundant switches and cables. Topology: Dual parallel tree networks connected at the top. 2. The cascade lines (cross links) between switches form a single network. Commercial network equipment refers to switches, dual-port single network cards or single-port dual network cards. FTE network communication detection screen Detection screen starts 3. The system must consist of a controller, server, and operating station. 4. FTE network includes redundant switches and cables. Tree network: The network formed by connecting to the A port on the A switch is called the A network (yellow tree). The network formed by connecting to port B on switch B is called network B (Green tree). Localhost receives the data node. FLEX operating station (F station): process data and related alarms and events, as well as other data information, come directly from the server; There are two connection methods for configuring ES-F: Fixed connection method (Static): Provides a permanent dedicated connection for a specific ES-F. Rotary connection method (Rotary): Provides an on-demand connection, suitable for when full-time operational access is not required. Console operation station (C station): process data and related alarms and events come directly from the controller; other data information comes from the server; Console Extension operating station (CE): process data and related alarms and events, as well as other data information, all information comes from station C. 7. A C300 controller has two IOLINKs. Each IOLINK supports up to 40 IO cards, and one controller supports up to 64 IO cards. Each set of C300 controller supports up to 64 IO Units (IOU). The C300 controller must be connected to the control firewall. The FTE address of the main controller of the C300 controller is set to an odd number, and the backup controller address is the address of the main controller + 1. Control Firewall (CF9) Control firewall: It appears in pairs in the FTE network, 8+1 ports, of which there is a dedicated network port for upward connection to the switch, and the remaining 8 network ports can be connected to the controller. Function: Refuse to accept all information that the controller does not need. If the communication speed slows down, the flow of unimportant information will be controlled. 8. The C300 controller consists of controller hardware and control software CEE (control execution environment), as shown in the figure:
Subscribe

Please read on, stay posted, subscribe, and we welcome you to tell us what you think.

submit
Copyright 2024 @ TZ TECH Co., LTD. .All Rights Reserved Disclaimer: We are not an authorized distributor or distributor of the product manufacturer of this website, The product may have older date codes or be an older series than that available direct from the factory or authorized dealers. Because our company is not an authorized distributor of this product, the Original Manufacturer’s warranty does not apply.While many DCS PLC products will have firmware already installed, Our company makes no representation as to whether a DSC PLC product will or will not have firmware and, if it does have firmware, whether the firmware is the revision level that you need for your application. Our company also makes no representations as to your ability or right to download or otherwise obtain firmware for the product from our company, its distributors, or any other source. Our company also makes no representations as to your right to install any such firmware on the product. Our company will not obtain or supply firmware on your behalf. It is your obligation to comply with the terms of any End-User License Agreement or similar document related to obtaining or installing firmware.

Sitemap | Blog | XML | Privacy Policy

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

Home

Products

whatsApp

contact

YOUR COOKIE SETTINGS

In addition, with your permission, we want to place cookies to make your visit anointeraction with slOC more personal. For this we use analytical and advertisingcookies. With these cookies we and third parties can track and collect yourinternet behawior inside and outside super-instrument.com. With this we and third parties adapt super-instrument.com and advertisementsto your interest. By clicking Accept you agree to this. If you decline, we only usethe necessary cookies and you unfortunately will not receive any personalizedcontent. Please visit our Cookie policy for more information or to change yourconsent in the future.

Accept and continue Decline cookies